- Demolition of the old boiler house on the site of Bunge Deutschland GmbH is now complete in readiness for the new preparation building (see photo);
- The piling and strip foundations topped off with the floor slab are expected to be finished by the end of 2010;
- The current project schedule calls for the works to be fully operational in time for the start of the rape harvest in 2011.
Bunge Deutschland GmbH
Management
Bunge Deutschland GmbH Media Contact:
Christoph Haase +49 621 3704 297 Christoph.Haase( at )bunge.com
Bunge Europe Media Contact:
Caroline Marcovitch +41 22 5929 768 Caroline.Marcovitch( at )bunge.com